(2020) Completed Projects

Phase II of Cornett Hall included the exterior improvements that were completed last year, the demolition, expansion and rebuilding of the upper lobby area and final four south-end lab spaces. Phase II also includes completion of an expanded new lower lobby area, construction of new storage building to replace the existing courtyard structure.

  • Scope: $7.1M
  • Funding Source: State Bond and Foundation Match
  • Status: Complete
  • Start Date: June 2019
  • Completion Date: April 2020
Completed Cornett Hall - Phase 1b

 

  • Scope: Replace seating covers with new / install new aluminum walk planks / paint metal panels beneath seating area.
  • Status: Complete
  • Start Date: February 6, 2020
  • Completion Date: June 1, 2020
Stadium

Recently, ˿Ƶ Tech celebrated the unveiling of the new John and Lois Stilwell Softball Stadium. This million-dollar project was possible thanks to the vision and lead gift from the Stilwells, financial support from the university, as well as generous contributions from friends and family. Thanks to this spirit of giving, ˿Ƶ Tech Owls Softball now boasts one of the finest facilities in the country. The Stilwell Stadium features a new turf field and bullpens, wrap-around bleachers with a press box, improved walkways, and a new building for concessions, restrooms, and a (heated!) team room. The field enables the Lady Owls to play in all seasons — and if you know Klamath Falls — you know how important that is. Now, all we need are new lights!

The "Light it Up" Stilwell Stadium is a fundraising campaign that will provide the $250,000 to install new LED lights this winter and complete the final details of the stadium. A lighted stadium will directly benefit our program and give the Owls a chance to host NAIA regional playoff games (reducing travel expenses) this spring and in future years. Additional benefits include improved opportunities for summer youth camps, boosting the local economy (with teams traveling to Klamath Falls), and ultimately improving community engagement with a top-notch facility. We are pleased to share that $90,000 has already been secured, leaving $160,000 remaining to accomplish this important project.

  • Scope: Install field lighting.
  • Funding Source: Donor and Fundraising Efforts
  • Status: Complete
  • Start Date: January 13, 2020
  • Completion Date: March 6, 2020
Completed Stilwell Stadium - Light It Up

The Student Rec Center project is underway with demolition of the bottom floor nearly complete. The project will include a new multi-purpose sport court, cardio and expanded weight room. Coaches offices that were displaced are being rebuilt on the first floor of the building and lobby renovations will begin next summer.

  • Scope: $3.5M
  • Funding Source: University Bond and Student Fees
  • Status: Complete
  • Start Date: June 2019
  • Completion Date: July 2020
  • 1% Construction Art
TechRec

 

(2021-6-24) Completed Project Art SRC

The new building will be home to the expanded interdisciplinary College of Engineering and Technology, including the departments of: Manufacturing and Mechanical Engineering Technology (MMET), Civil Engineering (CE), Electrical Engineering & Renewable Energy (EERE), Computer Systems Engineering Technology (CSET), Geomatics, Management, and ˿Ƶ Renewable Energy Center (OREC).

The project includes 70,000 GSF of new classroom and lab spaces organized around a central “Commons” area. Both the upper and lower levels have multiple labs, with integrated lab support spaces and classrooms. The lower level includes an auditorium, multiple offices and multiple conference/meeting rooms. The upper level includes a large conference room with adjacent breakout rooms, multiple offices and a café at the main entry.

CEET Building Exterior with Sculpture
  • Scope: New 70,000 square foot education building
  • Funding: UPE 785 / XI-Q Bond
  • Status: 100% completed
  • Start Date: January 2020
  • Completion Date: April 2022
     

(2019) Completed Projects

Facilities Staff are putting the finishing touches on the renovation of the X-Ray Labs in DOW 119 for the Medical Imaging Technology program. This includes the installation with the equipment partners Konica Minolta and Core Medical of state of the art digital X-Ray systems. Funding was made possible by a loan from the ˿Ƶ Tech Foundation.

  • Scope: $1.85M
  • Funding Source: General Fund
  • Status: Close Out
  • Start Date: June 2019
  • Completion Date: September 2019
Completed DOW Rad Science Lab
Emergency Storm Phase 2b

Storm drain, snow melt and road improvements in the interior of the Cornett Courtyard and roadways to Facilities Loop Road. This project paired up needed roadway improvements with core infrastructure improvements to increase value to campus utilizing state funding not normally available.

  • Scope: $710,705
  • Funding Source: State Bond
  • Status: Complete
  • Start Date: August 2018
  • Completion Date: August 2019
Emergency Storm Phase 3a

Main storm drain, electrical, parking lot and landscaping improvements along Danny Miles Way located behind LRC and to the Athletics Building. This project paired up needed parking lot improvements with core infrastructure improvements to increase value to campus utilizing state funding not normally available.

  • Scope: $655,000
  • Funding Source: State Bond
  • Status: Complete
  • Start Date: June 2019
  • Completion Date: September 2019
Emergency Storm Phase 3b

Main storm drain, and roadway improvements along Facilities Loop Road. This project paired up needed roadway improvements with core infrastructure improvements to increase value to campus utilizing state funding not normally available.

  • Scope: $912,865
  • Funding Source: State Bond
  • Status: Complete
  • Start Date: May 2019
  • Completion Date: September 2019
(2019-9-12) Completed Project Emergency Storm Phase 2b (1)

Replacement parking lot located between Facilities Loop Road and Danny Miles Way including 140 parking spaces. This new lot was funded through the construction of the CEET to offset spaces which will be inaccessible during construction.

  • Scope: $525,000
  • Funding Source: State Bond and Foundation Match
  • Status: Complete
  • Start Date: May 2019
  • Completion Date: September 2019
Completed Replacement Parking Lot Q